to 10 p.m. daily. The project will involve milling and resurfacing the existing roadway, which will require the use of heavy equipment and traffic control measures. Heavy equipment will be used to remove the existing pavement and prepare the surface for the new asphalt.
** Drivers are advised to plan alternate routes and avoid the area if possible. Through traffic will be able to use State Route 208 as a nearby alternate route. **Your task:** Expand on the summary. ## Elaboration on the Summary
The summary provides essential information for drivers navigating a situation where a specific area is experiencing significant disruption.