What a Concrete Slab Costs: The Line Items That Set the Price
Concrete prices vary so much by region, season and supplier that any single "cost per square foot" figure is more misleading than useful. What you can do is understand the line items that make up the price, work out the quantities yourself, and get local prices for each. That lets you compare quotes properly and see where the money goes. This page lists those line items, roughly in the order they appear on a job, and shows how to put them together with our slab cost calculator.
1. The concrete itself
Concrete is priced by the cubic yard (or cubic meter), so the first number is volume: length x width x thickness, all in feet, divided by 27.
Example: a 12 x 16 ft patio at 4 in thick is 12 x 16 x 0.333 = 64 cu ft, or 2.37 cu yd. With 10% added for uneven base and spillage, order about 2.6 cu yd. The same patio at 6 in thick needs 3.56 cu yd, about 3.9 with the margin.
That shows the biggest single lever: thickness. Going from 4 in to 6 in adds 50% to the concrete. Thickness is not a place to save money, though. Walkways and patios are commonly 4 in, driveways 4 to 6 in, and anything carrying vehicles or a building is set by the plans and local code.
The price per yard itself depends on:
- Strength: higher-psi mixes contain more cement and cost more.
- Admixtures and options: air entrainment for freeze-thaw areas, accelerators for cold weather, retarders for hot weather, fibers, color and smaller aggregate for pumping each add to the price.
- Bags versus ready-mix: bagged concrete costs much more per cubic yard than ready-mix but has no delivery charges, so it wins on very small jobs. See ready-mix truck or bagged concrete.
2. Delivery charges
- Short-load fees: most ready-mix plants charge extra for loads below a minimum volume. On a small slab this can be a large share of the concrete bill.
- Distance from the plant.
- Waiting time: the driver's time beyond a set unloading allowance is usually billed. Being ready when the truck arrives saves money.
- Timing: weekend, early-morning or after-hours deliveries may cost more.
3. Getting the concrete to the forms
If the truck can back up to the forms and reach with its chute, placement is cheap. If not, you need a line pump or boom pump, a motorized buggy, or a crew with wheelbarrows, all of which add cost.
4. Site preparation
- Excavation and grading to the right depth and slope, including removing sod, topsoil and roots.
- Removing an old slab: breaking out, hauling and disposal fees can rival the cost of the new concrete.
- Base: a compacted layer of crushed stone or gravel, commonly around 4 in for patios and walks, more on poor soils or where the plans call for it. Price the stone by the ton or yard, plus compaction equipment.
- Vapor retarder under interior slabs.
- Drainage: soft spots dug out and replaced, or drains added.
5. Forms
Lumber or steel forms, stakes, screws and form release, plus the labor to set them straight, level and to the right slope. Curved edges and steps take more time and material. Our calculator takes formwork as a cost per square foot of slab.
6. Reinforcement
Rebar or welded wire mesh, the chairs that hold it at the right depth, tie wire, and labor; or fibers added to the mix. A driveway or garage slab often has reinforcement specified; a garden path may not. The rebar calculator counts the bars for a grid. For any slab carrying vehicles or a structure, the reinforcement comes from the plans or engineer.
7. Placing and finishing labor
Usually the largest cost after the concrete, and the one that varies most with the finish:
- Broom finish: the plain, slip-resistant exterior finish, and generally the least labor.
- Smooth troweled: more passes and more skill; typical for interior floors.
- Exposed aggregate, stamped or colored: specialist work, extra materials (color, release agents, sealers) and more labor.
Our calculator takes labor as a cost per square foot. Ask contractors whether their per-square-foot price includes the base, forms and reinforcement or covers placing and finishing only.
8. Joints, curing and sealing
- Control joints, tooled while the concrete is plastic or saw-cut soon after, so the slab cracks along straight lines. A common rule of thumb is spacing of about 2 to 3 times the slab thickness in feet (8 to 12 ft for a 4 in slab), cut to a quarter of the slab depth.
- Isolation joint material where the slab meets walls, steps and existing concrete.
- Curing: curing compound, plastic sheeting or wet coverings, and cold-weather blankets if needed.
- Sealer, if wanted, often required for stamped and colored work.
9. Permits, inspections and design
Many areas require a permit for driveways, garage and building slabs, and work near property lines or in the public right of way. Structural slabs and footings need a design from the plans, a structural engineer and the local code, and inspections before the pour. Budget for permit fees and, where needed, engineering.
10. Things that raise any quote
- Difficult access, slopes and tight spaces
- Small jobs, which carry fixed costs (mobilization, minimum loads) over fewer square feet
- Cold or hot weather measures
- Thicker edges or footings around the perimeter
- Steps, ramps, curves and drains
Putting it together
- Measure the slab and decide thickness from your plans or local code.
- Get the local price per cubic yard for the mix you need, and ask about short-load and delivery charges.
- Get prices or estimates per square foot for labor and formwork, and separate figures for base, reinforcement, removal and finishing extras.
- Enter them in the slab cost calculator, which adds 10% waste to the concrete and totals concrete, labor and formwork.
- Add the items it does not cover: base, reinforcement, delivery fees, pump, removal, permits and sealing.
Doing it yourself
A homeowner can save the labor on a small, simple slab, but the work is heavy and the finishing window is short. Concrete burns skin, so budget for proper gear too: alkali-resistant gloves, rubber boots, eye protection and waterproof knee pads. Wet concrete is strongly alkaline and burns may not hurt until hours later, so wash any off promptly with clean water. Saw-cutting joints releases silica dust that causes lung disease: rent a wet saw or one with dust extraction and wear a fitted respirator. And line up enough helpers for the 80 lb bags or the truck. See how to pour a small concrete slab for the full process.