Cemex united kingdom announces new Swindon Dry Mortar and Sprayed Concrete Facility

  • Reading time:2 mins read
  • Post comments:0 Comments
You are currently viewing Cemex united kingdom announces new Swindon Dry Mortar and Sprayed Concrete Facility
Representation image: This image is an artistic interpretation related to the article theme.

Cemex UK’s Mortar business has been growing rapidly in recent years, driven by increasing demand for sustainable building materials. The company has been investing heavily in research and development to improve the environmental performance of its products.

  • Increased production capacity in the South East and South West
  • Ability to supply national markets
  • Enhanced sustainability through lower carbon dry mortar and sprayed concrete production
  • Creation of new jobs and economic growth in the region
  • The new plant will be built on a 20-acre site in Swindon, Wiltshire, and will feature state-of-the-art technology and equipment. The facility will be designed to minimize its carbon footprint and will incorporate green building principles.

  • Lower carbon dry mortar production will reduce greenhouse gas emissions by up to 30%
  • Sprayed concrete production will reduce carbon emissions by up to 50%
  • The facility will be powered by renewable energy sources, such as solar and wind power
  • The site will be designed to minimize waste and promote recycling
  • The new plant will be a significant step forward for Cemex UK’s Mortar business, enabling the company to increase its production capacity and supply national markets.

    New Plant to Reduce Heat and Fuel Consumption

    The company is investing in a new plant that will significantly reduce heat and fuel consumption in the production process.

  • Reduced heat and fuel consumption, which will help to minimize the company’s environmental impact.
  • Increased efficiency and productivity, which will enable the company to produce high-quality products at a lower cost.
  • Improved product quality, which will help to increase customer satisfaction and loyalty.
    Construction and Timeline
  • Building work for the new facility has begun, and the site is planned to be operational during the second half of 2025.

    Leave a Reply